7b- 3D elastic strain Integration–Drained Conditions(Effective Stres.mp4

7b- 3D elastic strain Integration–Drained Conditions(Effective Stres.mp4

Preview unavailable

You must log in or sign up to view this lesson.

LoginSign up

English - Round (6): Module 2 - Settlement Analysis With Settle3 Software

Buy nowLearn more

About Drip Course and The course Instructor!

  • Must Read - Important Information About the Course
  • Frequently Asked Questions (FAQs)
  • Meet Your Instructor – Dr. Ahmed ElMouchi, PhD, PEng

Chapter (1): Introduction

  • 1- Introduction-Edited.mp4
  • Course Content by Week!

Chapter (2): Influence Zones

  • 2a- Stress Bulb.mp4
  • 2b - Square or Circular Footings - Influence Zone.mp4
  • 2c- Strip Footing - Influence Zone.mp4
  • 2d- Rectangular Footing - Influence Zone.mp4
  • 2e- Footing Interaction.mp4
  • Quiz - Part 2

Chapter (3): Estimating Stress Distribution (Boussinesq)

  • 3a- General.mp4
  • 3b- Point Concentrated Load (kN).mp4
  • 3c- Line Load (kN per m).mp4
  • 3d- Uniformly Loaded Strip (kN per m).mp4
  • Example 1 Settle3 - Strip Load.mp4
  • 3e- Uniformly Loaded Circle (kN per m2).mp4
  • Example 2 Settle3 - Circular Load.mp4
  • 3f- Uniformly Loaded Rectangle (kN per m2).mp4
  • Quiz - Part 3

Chapter (4): Settle3 – Other Stress Distribution Methods

  • 4a- Settle3 Other Distribution Methods.mp4
  • Example 3 - Settle3- Stress Distribution Methods Com.mp4

Chapter (5): Immediate, Consolidation, and Creep Settlements

  • 5a- Drained Vs Undrained Loading.mp4
  • 5b- Immediate, Consolidation, and creep settlements.mp4
  • 5c- Drained Settlements & Undrained Distortion.mp4
  • 5d- Local Yield Due to Undrained Distortion.mp4
  • Quiz - Part 5

Chapter (6): Cohesive Soil Vs Cohesionless soil settlement

  • Cohesive Vs Cohesionless soil settlement.mp4
  • Notes on Undrained Distortion
  • Quiz - Part 6

Chapter (7): Elastic Displacement Method

Delayed 7 days

  • 7a- Approximating Soil response as an Ideal Elastic Material.mp4
  • 7b- 3D elastic strain Integration–Drained Conditions(Effective Stres.mp4
  • 7c- 3D elastic strain Integration–Undrained Distortion (Total Stress.mp4
  • 7d- Flexible Strip Footing Solution.mp4
  • Example 4 - Settle3 - Flexible Strip.mp4
  • 7e- Flexible Circular Footing Solution.mp4
  • Example 5 - Settle3- Circular Footing.mp4
  • 7f- Circular Footing – General Solution.mp4
  • Example 6 - Settle3- General Circular Footing.mp4
  • 7g- Rigid or Flexible Footing.mp4

Chapter (8): Settlement of cohesionless Soils from SPT and CPT (CFEM and AASHTO)

Delayed 7 days

  • 8a- From SPT – Peck, Hanson and Thornburn (1974 )- CFEM.mp4
  • Example 7 - Settle3 - Peck 1974 Method - Copy.mp4
  • 8b- From SPT - Burland and Burbridge (1985) – CFEM.mp4
  • Example 8 - Settle3 - Burland and Burbridge Method - Copy.mp4
  • 8c- From SPT – Hough Method (1959) – AASHTO 2020.mp4
  • 8d- From CPT – Schmertmann et al. (1978) – CFEM & AASHTO 2020 – Coarse-Grained.mp4
  • Example 9- Settle3 - Schmertmann Method - Copy.mp4
  • Quiz - Part 8

Chapter (9): Settle3 – Two More Empirical Methods for Settlement Calculations of Cohesionless Soil

Delayed 7 days

  • 9a- From SPT – Schultze and Sherif (1973).mp4
  • 9b- From SPT – D'Appolonia Method (1970).mp4
  • 9c- Settle3 – Comparing 4 empirical methods of SPT.mp4
  • 9d- Accuracy and Reliability of different empirical methods.mp4

Chapter (10): Notes on Obtaining Settlement Parameters

Delayed 7 days

  • 10a- General.mp4
  • 10b- E from Shear Wave Velocity Vs Measurements.mp4
  • Quiz - Part 10

Chapter (11): Settlement Parameters of Cohesionless Soils (Drained E’)

Delayed 7 days

  • 11a- Typical Values of E.mp4
  • 11b- E from SPT N-Value.mp4

Chapter (12): Consolidation Settlement

Delayed 14 days

  • 12a- 1D - Consolidation Test – ASTM D2435.mp4
  • Step by Step Consolidation Test
  • 12b- 1D Consolidation - Data Interpretation.mp4
  • 12c- 1D Consolidation - Settlement Calculation.mp4
  • 12d- 1D Consolidation (Terzaghi 1996) - Degree of Consolidation – Time D.mp4
  • Example 10 - Settle3 - Primary Consolidation.mp4
  • Example 11- Settle3 - Secondary Consolidation.mp4
  • 12e- 3D Consolidation Vs 1D Consolidation (Poulos 2000).mp4
  • 12f- Is Preconsolidation Pressure a Unique Value for the soil layer.mp4
  • Example 12- Settle3 - OCR- PCP - OCM'.mp4
  • Quiz - Part 12

Chapter (13): Settlement Parameters of cohesive soils (Eu and Consolidation Parameters)

Delayed 14 days

  • 13a- General.mp4
  • 13b- Undrained Young’s Modulus Eu – For Undrained Distortion.mp4
  • 13c- Consolidation - Compression Index Cc.mp4
  • 13d- Consolidation - Compression Ratio CR = Ccε.mp4
  • 13e- Consolidation - Recompression Index Cr.mp4
  • 13f- Consolidation–Constrained Modulus D–Coefficient of Volume Comp mv.mp4
  • 13g- Consolidation - Coefficient of Consolidation cv.mp4
  • 13h- Consolidation - Permeability k – Typical Values.mp4
  • 13i- Consolidation - Secondary Compression Cα- Typical Values.mp4
  • 13j- Consolidation - Secondary Compression Cα and Cαε.mp4

Chapter (14): Settle3 – Embankment

Delayed 14 days

  • Example 13- Settle3 - Embankment.mp4
  • Example 14- Settle3 - Preload with Back Analysis.mp4

Chapter (15): Settle3 – Excavation and Dewatering

Delayed 14 days

  • Example 15 - Settle3 - Excavation and Dewatering.mp4

Chapter (16): Allowable Settlement Limits

Delayed 14 days

  • 16a- General.mp4
  • 16b- Structural Frame.mp4
  • 16c- Load Bearing Walls or Raft Foundation.mp4
  • 16d- CFEM Limits.mp4
  • 16e- ICE 2012 Limits.mp4

Chapter (17): Ground Improvement - Soil Replacement

Delayed 21 days

  • Example 16 - Settle3-Ground Improvement- Soil Replacement.mp4

Chapter (18): Ground Improvement - Stone Columns

Delayed 21 days

  • 18a- Introduction.mp4
  • 18b- Design Theory.mp4
  • 18c- Parameters Settle3 Requires.mp4
  • 18d- Drainage Effect.mp4
  • 18e- Sensitivity Analysis.mp4
  • Example 17- Settle3 - Stone Columns.mp4

Chapter (19): Ground Improvement - Vibro-Compaction

Delayed 21 days

  • 19a- Introduction.mp4
  • 19b- Design Theory.mp4
  • 19c- Parameters Settle3 Require.mp4
  • 19d- Other Parameters (Diameter and Spacing).mp4
  • Example 18- Settle3 - Vibro-compaction.mp4

Chapter (20): Ground Improvement - Preloading with Wick Drains

Delayed 21 days

  • 20a- Introduction.mp4
  • 20b- What Parameters Settle3 Require.mp4
  • Example 19 - Settle3- Preloading with Wick Dra.mp4

Chapter (21): Modulus of Subgrade Reaction k

Delayed 21 days

  • 21a- Typical Values (kN per m3) – Terzaghi (1955).mp4
  • 21b- NAVAC 1986 for Dry Soils Correlations.mp4
  • 21c- Summary Typical Values of k (Three References).mp4
  • Example 20 - Settle3- Isloated Footing.mp4
  • Example 21- Settle3 - Raft.mp4
  • Example 22 - Settle3 - Importing Multiple Loads.mp4
  • Quiz - Part 21

Chapter (22): Factored Geotechnical Resistance - SLS

Delayed 21 days

  • 22a- Limit State Design.mp4
  • 22b- LSD European Vs North American Approach.mp4
  • 22c- SLS Resistance Factor.mp4

Chapter (23): Geotechnical - Structure Design Cycle

Delayed 21 days

  • 23- Geotechnical-Sturtcure Design Cycle.mp4

Assignment (Modulus of Subgrade Reaction for Raft)

Delayed 21 days

  • Homework - k Calculations.pdf